Concrete takeoff
Know the concrete quantity before you order.
Measure your slab, footing, wall, column, or post holes. SolverOrg makes the volume, allowance, and purchasing rule visible.
Project takeoff
Engine resultOrder quantity
1.75 yd³
Rounded upward to the supplier/user-configured cubic-yard increment.
Based on 12 ft × 10 ft at 4 in deep.
- Base quantity
- 1.48 yd³
- Extra material allowance
- +0.15 yd³
- Final requirement
- 1.63 yd³
- Order quantity
- 1.75 yd³
Show your work
Project volume
12 ft × 10 ft × 4 in= 1.48 yd³ base quantity10% extra material allowance
1.48 yd³ plus 10%= 1.63 yd³ final requirementSupplier order quantity
Rounded up using the selected purchasing rule= 1.75 yd³ to order
Assumptions & warnings
- 10% extra material allowance
- Order in 0.25 yd³ increments
- info: The ready-mix order quantity was rounded upward and exceeds the calculated final quantity.
Technical details, sources & version
- SI and customary length and volume unit definitionsexact definition
The engine uses metre-based unit factors for supported length and volume conversions.
- Rectangular-prism volume relationshipmathematical relationship
Volume equals normalized length multiplied by normalized width and normalized depth.
- Circular-cylinder volume relationshipmathematical relationship
Volume equals pi times radius squared times normalized height or depth.
- User-configured concrete waste factoruser configurable assumption
- User or supplier-configured ready-mix purchasing incrementuser configurable assumption
The calculator does not assume a universal supplier order increment.
- Configured bag yielduser configurable assumption
Bag yield is product-specific and must be supplied from the selected product or project information.
- User-entered material unit costuser configurable assumption
Normalized final volume: 1.25 m³
concrete-quantity-order · v1.0.0 · released 2026-08-12
Owner: SolverOrg maintainers · Reviewed 2026-08-12
Method
The engine normalizes dimensions to metres, calculates rectangular or cylindrical volume, applies a selected waste factor, then applies only the configured purchasing rule.
Worked example
A 12 ft by 10 ft slab at 4 in depth starts at about 1.48 yd³. This default worksheet shows how the selected 10% allowance and quarter-yard purchasing increment affect the final order quantity.
Measure before you pour
Measure finished length and width inside the forms, then measure planned poured depth. For footings and walls, measure each distinct run separately. For columns or holes, record diameter, height or depth, and the count of identical pieces.
Related tool
Cubic Yard Calculator — Use the cubic-yard calculator to combine or compare rectangular project areas before selecting a material-specific takeoff.